The world’s longest rail tunnel is the Gotthard Base Tunnel in Switzerland, stretching 35.4 miles (57 km) through the heart of the Alps. It opened on June 1, 2016, displacing Japan’s Seikan Tunnel, which had held the record since 1988.

Why Build at the Base of the Alps?

The idea of tunneling through the base of the Alps — rather than partway up the slopes — was first sketched by engineers in 1947. Older Alpine rail routes wound up steep mountain gradients, forcing trains to slow down and carry lighter loads. By running at just 1,800 feet above sea level, the Gotthard Base Tunnel creates an essentially flat crossing. That means heavy freight trains can pass through as efficiently as if the Alps were not there at all — the mountains become scenery, not an obstacle.

How Long Did It Take to Build?

Construction ran for 17 years, beginning in 1999. Workers bored through some of the hardest rock in Europe — Alpine granite and gneiss — using massive tunnel boring machines and conventional drilling and blasting. In total, crews excavated 94 miles of tunnels, including two main rail tubes, service galleries, and emergency safety passages. The project removed 31 million tons of rock, much of which was crushed and recycled as the concrete lining the tunnel walls.

What Is It Like Deep Inside?

At its deepest section, 7,550 feet of mountain presses down from above. At that depth, the Earth’s internal heat warms the surrounding rock to between 115 and 122 degrees Fahrenheit. To keep working conditions survivable, engineers ran cold-water pipes miles underground to cooling units positioned at every active work face. Without them, the air temperature near the bare rock would have been closer to a blast furnace than a construction site.

What Did It Cost?

The final price tag came to 12.2 billion Swiss francs, making it one of the most expensive infrastructure projects in human history. The investment reflects not just the tunnel’s scale but the extreme engineering challenges of working deep beneath a major mountain range for nearly two decades.

What Record Did It Break?

Before June 1, 2016, the longest rail tunnel in the world was Japan’s Seikan Tunnel, which connects the islands of Honshu and Hokkaido under the Tsugaru Strait. The Seikan held the record for 28 years. The Gotthard Base Tunnel surpassed it by a significant margin — the Swiss tunnel is roughly 10 miles longer.

Why Does It Matter for Rail Travel?

The tunnel is a cornerstone of Switzerland’s NRLA project (New Rail Link through the Alps), designed to shift heavy freight from road to rail across Europe. By flattening the Alpine crossing, it allows longer, heavier trains to run at higher speeds without the energy penalties of mountain climbing. It is both a feat of engineering ambition and a practical solution to one of Europe’s oldest transportation bottlenecks.

FREQUENTLY ASKED

How long is the Gotthard Base Tunnel? ▾

The Gotthard Base Tunnel is 35.4 miles (57 kilometers) long, making it the longest railway tunnel ever built on Earth.

When did the Gotthard Base Tunnel open? ▾

The Gotthard Base Tunnel officially opened on June 1, 2016, after 17 years of construction beginning in 1999.

What tunnel did the Gotthard Base Tunnel replace as the world's longest? ▾

It displaced Japan's Seikan Tunnel, which had held the world record for the longest rail tunnel since 1988 — a reign of 28 years.

How deep underground is the Gotthard Base Tunnel? ▾

At its deepest point, the tunnel has up to 7,550 feet of mountain rock pressing down overhead, well below the base of the Alps.

How hot does it get inside the Gotthard Base Tunnel? ▾

The surrounding rock reaches temperatures of 115 to 122 degrees Fahrenheit at the tunnel's deepest sections, requiring active cooling systems to keep workers safe.

How much did it cost to build the Gotthard Base Tunnel? ▾

Construction cost approximately 12.2 billion Swiss francs, making it one of the most expensive infrastructure projects in history.